Recreation
ATB Centre

Project Details

ATB Centre


Location
Lethbridge, AB, Canada
Owner/Client
City of Lethbridge
Completion
2017
Role
Electrical Engineering Consulting Services

Phase 2 of the Lethbridge Crossings Leisure Complex consists of the design and construction of a full aquatics centre, a multi-sport field house, a fitness centre complete with indoor track, a gymnasium, an indoor playground and child minding area, various commercial lease spaces, and utility / amenity spaces required to support such a facility. This Phase 2 portion of the complex will be connected to the existing Phase 1 to provide continuous and easy access to all the leisure complex offers the community at large.

Prev Back to Recreation Next

Sign up to join the SMP newsletter mailing list   

Copyright © SMP Engineering. All rights reserved. Please read our terms of use and privacy policy.
Site by: Ci2 Group Inc.